Please ensure Javascript is enabled for purposes of website accessibility

MEB Freshwater Project, Maputo

MEB has been awarded an EPC contract(Engineering, Procurement and Construction) and O&M (Operation and Maintenance) contract in Mozambique for 30,000 m3/day water treatment plant.
A dam structure with a concrete spillway and a water reservoir, part of the Freshwater Project, is framed by a stone wall in the foreground under Maputo's clear blue sky.

Table of Contents

MEB has been awarded an EPC contract(Engineering, Procurement and

Construction) and O&M (Operation and Maintenance) contract in Mozambique for 30,000 m3/day water treatment plant.

Growing Demand For Sustainable Fresh Water Sources

With the growing demand for water, the MEB team brings the combination of technical and execution expertise. We will leverage our full suite of integrated solutions, tools, including design strategy.

MEB’s solution is ideal for remote locations or river applications such as this. Once commissioned, the entire plant will be fully automated and able to be remotely monitored with minimal maintenance.

MEB provides leading technology solutions and services which minimize the gaps in construction and operating.

By implementing a continuous monitoring procedures of business systems within the organizations, MEB allows for improved alignment and consistency, and a substantially reduced rate of accidents & incidents.

In order to provide its clients with the most comprehensive tools to optimize and streamline their business, MEB’s solutions include both the operational and the administrative aspects of each of the projects in which it is involved.

Share:

Case Study

A revolutionary approach to water supply

To cope with a crippling and prolonged drought crisis, MEB installed a containerized desalination plant at Richards Bay, South Africa. The project was completed in just seven months. The containers were easily transported to the designated location.1

More Posts

Related Posts