Greater Maputo in Mozambique was in urgent need of drinking water for the population due to severe water scarcity in the region. The country had experienced high temperatures and decreased levels of rainfall.

  • Location: Greater Maputo, Sabie, Mozambique
  • Solution: Fresh Water
  • Project: Engineering, Procurement, Construction, (EPC) and O&M
  • Capacity: 30,000 m3/day

Challenges

We met the challenge of supplying a pumping station intake and a water treatment system in an extremely short delivery time. The self-contained flexible system can be mobilized at a competitive cost compared with long-term standard equipment packages. Although it is temporary, it is robust enough in comparison with permanent systems only more efficient, more productive and leaner – with a smaller footprint and lower civil engineering cost.

 

In tandem, the project aims to alleviate the regional water shortage problem by supplying clean water to 1 million people, saving time and cost.

Solution

Based on needs for rapid delivery, fast set-up, and immediate deployment. We work with multi-source equipment suppliers from Germany, Holland, Italy and Israel. The plant treats river water to potable quality, leveraging our full suite of integration tools, including design strategy, to deliver the project safely and to the highest standards.

Water sanitation is maintained through cost-effective chlorine generation on-site for high quality sanitated water, reducing OPEX. Ideal for remote locations or river applications, the plant is fully automated and can be remotely monitored with minimal maintenance.

Our Blog

Check Our News

The Impact of the Municipal Billing System on Revenue Collection in South Africa

Eskom states that while residents in the township claim they are willing to pay for electricity, their records say the opposite – Eskom proposed that prepaid meters needed to be installed in Soweto as the grid must be protected and revenue collected. The utility has told residents that they need to install prepaid meters or get cut off and remain in the dark. Soweto owes more than R4.5 billion.

An industrial facility with several tall smokestacks releasing white smoke stands by a body of water, engaging in desalination processes under a partly cloudy sky.
Desalination

As costs decrease and technology improves, the benefits of utilising desalination as a key driver to eliminate water shortages, can no longer be denied