Kashagan Oil Field (Kazakhstan)
280 MW natural gas fired combined cycle power station and utilities area. Gas and steam turbines.
- Solution: Execution of all civil works, steel structure, mechanics, electrical erection, piping, instrumentation, painting and insulation works to build a 280 MW natural gas fired combined cycle power plant composed of gas turbines and steam turbines. Supplying power for Trench 1 and 2 of Kashagan Petroleum Area. Supply of pipes, valves, fire-fighting systems, insulation material, structural steel and HVAC systems. Installation of insulation, HVAC and structural steel. Painting works and fire-proofing.
- Project: Engineering, Procurement, Construction, (EPC
Challenges
Despite challenges related to remote area travel restrictions, civil unrest, and a man power shortage, the project was completed and showing excellent results.
Our Blog
Check Our News

MEB has over the years identified better opportunities and solutions to assist with closing the finance gap for water infrastructure. In order to improve the water infrastructure planning process, we base our designs and plans on the development objectives of our clients and provide continuous support to help analyse the best options available to develop these objectives into a workable financing model that is established with current challenges in mind.
August 4, 2022