Kashagan Oil Field (Kazakhstan)
280 MW natural gas fired combined cycle power station and utilities area. Gas and steam turbines.
- Solution: Execution of all civil works, steel structure, mechanics, electrical erection, piping, instrumentation, painting and insulation works to build a 280 MW natural gas fired combined cycle power plant composed of gas turbines and steam turbines. Supplying power for Trench 1 and 2 of Kashagan Petroleum Area. Supply of pipes, valves, fire-fighting systems, insulation material, structural steel and HVAC systems. Installation of insulation, HVAC and structural steel. Painting works and fire-proofing.
- Project: Engineering, Procurement, Construction, (EPC
Challenges
Despite challenges related to remote area travel restrictions, civil unrest, and a man power shortage, the project was completed and showing excellent results.
Our Blog
Check Our News
The beneficiation of sludge is encouraged through the South African Wastewater Sludge Guidelines to ensure sustainable sludge management. However, not all the sludge produced in South Africa is of such quality that it can be used beneficially, which leaves disposal as the only feasible option.
August 11, 2022